-
Butt and Electro Fusion
BE-48 | Main laying | 2 days
-
Abrasive Wheels - Portable
MS-14 | Main laying | ½ day
-
Dig Safe
MS-58 | Main laying | ½ day
-
Using utility plans
MS-61 | Main laying | ½ day
-
Network Construction Operations Water NVQ Level 1
NCO-1 | Main laying | day
-
NCO Main Laying Level 2 (Non Experienced)
NCO-2-M | Main laying | 5 days
-
NCO Mains and Service Laying Level 2
NCO-2-MS | Main laying | 5 days
-
Network Construction Operations Water NVQ Level 3
NCO-3 | Main laying | day
-
Main Laying Comprehensive
WS-3 | Main laying | 5 days
-
Installation, Modification & Repairs
WS-4 | Main laying | 4 days
-
Electrofusion Jointing
WS-5 | Main laying | 1 day
-
Butt Fusion Jointing
WS-6 | Main laying | 1 day
-
Jointing Composite Barrier Pipes
WS-7 | Main laying | 1 day
-
Mains Commissioning
WS-8 | Main laying | 2 days
-
Mains Pressure Testing
WS-9 | Main laying | 1 day
-
Mains and Service Pipe Tracing and Surveying
WS-74 | Main laying | 1 day
-
Installation of PE Barrier Pipes for supervisors
WS-77 | Main laying | 1 day
-
Large Diameter Water Main Laying
WS-78 | Main laying | 3 days
-
Safe Control of Mains Connections
WS-79 | Main laying | ½ day
-
Private Sewers Transfer Update
WS-80 | Main laying | ½ day
-
Water Industry Induction
WS-95 | Main laying | 2 days
-
Water Industry Health and Safety Induction
WS-96 | Main laying | 1 day
-
Manual handling for water industry field based operators
WS-101 | Main laying | ½ day
-
Designing Water Networks
WS-132 | Main laying | 2 days